Install the battery.
5.
Route the cable
6.
Connect the cable to the controller.
7.
For clarity, the server is not shown in this illustration.
Dedicated iLO2 optional module connector
To install the component:
Power down the server (on page 20).
1.
Remove the server from the rack (on page 20).
2.
Remove the primary access panel (on page 21).
3.
("Battery cabling for
BBWC" on page 54).
Hardware options installation 47