Assembly; Plastic Shield Installation; Nylon Line Head Installation - Echo GT-225 Operator's Manual

Hide thumbs Also See for GT-225:
Table of Contents

Advertisement

ASSEMBLY

ASSEMBLY

Plastic Shield Installation

Parts Required:
Rapid Loader
washer, 3/8 - 24 Lock Nut, Two (2) Pre-cut
Nylon Line
Plastic Shield Assembly.
Cut-off knife on debris shield has sharp edges. Avoid contact when installing or removing line head.
Wear Gloves or personal injury may result:
Cut-off knife is sharp.
Gear case and surrounding area may be hot.
1. Remove wing nut (A), washer (B), and bolt (C).
2. Snap the shield over the bearing housing.
3. Install bolt (C), washer (B), and wing nut (A).

Nylon Line Head Installation

1. Remove plastic threaded shaft sleeve from threaded PTO
shaft.
2. Align locating hole in upper plate with hole in bearing
housing and insert locking tool (A).
3. Place large washer (B) then line head (C) on threaded shaft,
followed by small metal washer (D) and lock nut (E).
4. Install locknut. Turn lock nut clockwise, and tighten securely.
Remember to remove the locking tool.
14
TM
Head, Large washer, Small
203 x 2 mm
(8 x 0.080 in.),
B
A
A
C
D
E
GT-225
C
B
X7722271506
© 02/2015 ECHO Inc.

Advertisement

Table of Contents
loading

Table of Contents