Operation - Volvo C70 Quick Manual

Hide thumbs Also See for C70:
Table of Contents

Advertisement

OPERATING THE ROOF "TOP DOWN & TOP UP"
PREPARATIONS
No objects on parcel shelf, roof or boot lid.
2 m clearance and 0.2 m behind.
Level ground.
Outside temperature above -10 ˚C.
Closed cargo separator and boot lid.
The car must be stationary.
Pay attention that no individual is close to
the roof's moving parts during its opera-
tion.
The side windows lower several centimetres
when the roof is operated. They then return
automatically.
CARGO SEPARATOR
The cargo separator limits the cargo area to
make space for the folding roof.
1.
Raise the cargo separator during loading.
2.
Lower the cargo separator fully into the
catches (3) before lowering the roof. See
decal on the cargo separator.

OPERATION

1.
Engine at idling speed.
2.
Depress the brake pedal.
3.
Press and hold button (A) or (B) until a
signal sounds and the message ROOF
CLOSED/ROOF OPEN is shown in the
display.
4.
Release the button.
LOADING ASSISTANCE
Raise/lower the lowered roof to facilitate
loading.
1.
Press the button and wait several se-
conds until the roof is raised. Raise the
cargo separator, load, and then fold it
down fully.
2.
Press the button again to lower.
2,0m
0,2m

Advertisement

Table of Contents
loading

Table of Contents