Download Print this page

Operation - Volvo C70 Quick Manual

Hide thumbs Also See for C70:

Advertisement

OPERATING THE ROOF "TOP DOWN & TOP UP"
PREPARATIONS
• No objects on parcel shelf, roof or boot lid.
• 2 m clearance and 0.2 m behind.
• Level ground.
• Outside temperature above –10 °C.
• Closed cargo separator and boot lid.
• The car must be stationary.
• Pay attention that no individual is close to
the roof's moving parts during its operation.
The side windows lower several centimetres
when the roof is operated. They then return
automatically.
CARGO SEPARATOR
The cargo separator limits the cargo area to
make space for the folding roof.
1. Raise the cargo separator during loading.
2. Lower the cargo separator fully into the
catches (3) before lowering the roof. See
decal on cargo separator.

OPERATION

1. Engine at idling speed.
2. Depress the brake pedal.
3. Press and hold button (A) or (B) until a signal
sounds and the message ROOF CLOSED/
ROOF OPEN is shown in the display.
4. Release the button.
LOADING ASSISTANCE
Raise/lower the lowered roof to facilitate
loading.
Press the button and wait several seconds until
the roof is raised. Raise the cargo separator,
load, and then fold it down fully.
Press the button again to lower.
2,0m
0,2m

Advertisement

loading