Operations To Be Performed During The Second Phase Of Test Cycle - Electrolux with VS81 timer Service Manual

Washing machines and washer-dryers with timer
Table of Contents

Advertisement

6.1.2
Operations to be carried out during the second phase of the test cycle
→ Functional check
Knob position
Phase
Timer advance after a few
seconds (8 – 15)
Water fill to 1
Select the COTTON
90° PROGRAMME
2
(step no. 3 – heating
element not switched
on)
Motor inversions when full
(with water in tub)
2001.08 eb
→ Fault
Timer does not advance
Solenoid valve does not fill
st
level
st
Fills beyond 1
"FULL" consensus signal not
received, faulty contacts on
pressure switch
Motor does not rotate only with
load (i.e. washing in drum) or in
impulse mode; when empty, motor
rotates correctly
Motor "jerks" when loaded
→ Check with machine off
Timer or pressure switch blocked on
"FULL" 1 level
Timer motor blocked/interrupted
Timer contact
Solenoid interrupted/blocked
Wiring to solenoid valve
Solenoid valve does not close
Pressure switch does not
switch/leaks
level
Tubes / Air chamber blocked or
perforated
Pressure switch does not switch
correctly
Timer faulty (electronic section)
Tachometric generator faulty
(damaged)
33
→ Component to be
repaired/replaced
st
Timer / 1
level pressure switch
Timer
Timer
Solenoid valve
Wiring / Connectors
Solenoid valve / Wiring
st
1
level pressure switch faulty
Check, clean and repeat the test
st
1
level pressure switch faulty
(rarely occurs)
Timer (rarely occurs)
Coil of tachometric generator
599 34 85-05

Advertisement

Table of Contents
loading

Table of Contents