Ceiling Opening Dimension And Hanging Bolt Location; Installation Of Unit - LG MFL42803121 Installation Manual

Table of Contents

Advertisement

Ceiling dimension and hanging bolt location

Installation of Unit

Install the unit above the ceiling correctly.
CASE 1
POSITION OF SUSPENSION BOLT
• Apply a joint-canvas between the unit and duct to absorb
unnecessary vibration.
• Apply a filter Accessory at air return hole.
Dimension
A
B
C
D
Chassis
850 900 383 575
7/9/12/15k BTU/h
(33-7/16) (35-7/16) 383(15) (22-5/8) (3-11/16) (7-7/16)
1130 1180 383 575
18/24k BTU/h
(44-7/16) (46-7/16) 383(15) (22-5/8) (3-11/16) (7-7/16)
CASE 2
• Install the unit leaning to a drainage hole side as a figure
for easy water drainage.
POSITION OF CONSOLE BOLT
• A place where the unit will be leveled and that can support
the weight of the unit.
• A place where the unit can withstand its vibration.
• A place where service can be easily performed.
[Unit: mm(inch)]
E
F
G
H
I
J
93
190
21
795 163 820
(7/8) (31-5/16) (6-7/16) (32-5/16)
93
190
21 1065 163 1100
(7/8) (41-15/16) (6-7/16) (43-5/16)
B
A
J
H
Drain Pump use
Drainage hole
M10 Nut
M10 SP. washer
M10 washer
M10 washer
M10 SP. washer
M10 Nut
Installation Manual 9
Installation
X 4
(Local
X 4
supply)
X 4
X 4
(Local
X 4
supply)
X 4

Advertisement

Table of Contents
loading

Table of Contents