Installer Checklist To Be Completed By Installer Upon Installation - Bosch C 950 Installation Manual

Hide thumbs Also See for C 950:
Table of Contents

Advertisement

15
Installer Checklist to be completed by installer
upon installation
Serial Number
(8 digit serial number is located
on rating plate on right side
panel)
1)
Gas Pressure Reading
Static
Operating
Water Pressure
Building Water Pressure
Range if on Well system
Installing Company
Installer name
Address
Phone
Table 61
1) See Chapter 4.14, page 36 and gas pressure table (to be filled out by installer)
Installation manual should be left with the owner after
the installation is tested and completed.
Greentherm
___ ___ ___ ___ ___ ___ ___ ___

Installer Checklist to be completed by installer upon installation | 67

6 720 805 440 (2014/11)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C1050es

Table of Contents