Fujitsu PRIMERGY ServerView BX900 User Manual page 57

Blade server systems, serverview management blade user interface description
Hide thumbs Also See for PRIMERGY ServerView BX900:
Table of Contents

Advertisement

Power Management
Control via Tabs
Figure 46: Power Management – Power Switch tab (2/4)
Scheduled System Power Switch On/Off Timer
Here the power-on and power-off time for the system unit can be specified differently or identically for each
weekday. To avoid conflicts with the times which have been set separately for the server blades, the Optimum Time
button should be used to ensure that the server blade settings from the system unit setting are taken into account.
Only then you should enable the settings with Apply.
If power consumption control was enabled under Settings → System Unit → Alerting (Event Configuration tab, Event
Log Filter box, Power Control checkbox), you can use the Trap input boxes to set the warning time at which the
message is to be sent.
Figure 47: Power Management – Power Switch tab (3/4)
Server Blade Power-On/Off Sequence
Here you configure the order in which the server blades are to be powered on and off. To do this, move the server
blades which are to participate to the right-hand window and arrange them in descending sequence. The
uppermost server blade will be powered on first and powered off last.
You can specify the time delay (in minutes) which is to exist between powering on the system unit and powering
on the first server blade.
You can specify the time delay (in minutes) which is to exist between powering a server blade on/off and powering
the next server blade on/off.
You can choose between Graceful Shutdown And Power-Off and Hard Power-Off when powering off the server blades.
ServerView BX900 Management Blade
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents