14
Installation
Handling
A specific lifting method is
recommended as follows:
1. 4 lifting points are built into the
unit.
2. Slings and spreader bar to be
provided by rigger and attached
to the 4 lifting points.
3. Minimum rated lifting capacity
(vertical) of each sling and
spreader bar shall be no less than
the tabulated unit shipping
weight. Refer to Figures 1 and 2
Figure 1 - Rigging the unit - CGWN - CCUN (205-211)
D
CAUTION: This unit must be lifted
with the outmost care. Avoid shock
load by lifting slowly and evenly. To
prevent any damage, position the
lifting bar so that the slings do not
touch the unit.
A
C
CG-SVX06D-E4