10. Appendixes

10.1 Gas Conversion

This boiler is configured for Natural Gas at the factory. If conversion
to Propane Gas is required, use the conversion kit supplied with
the boiler.
WARNING
This conversion kit must be installed by a qualified service
agency* in accordance with Navien's instructions and all
applicable codes and requirements of the authority having
jurisdiction. The information in these instructions must be
followed to minimize the risk of fire or explosion or to prevent
property damage, personal injury or death. The qualified
service agency is responsible for the proper installation of
this kit. The installation is not proper and complete until the
operation of the converted appliance is checked as specified in
the manufacturer's instructions supplied with the kit.
* A qualified service agency is any individual, firm, corporation or company
which either in person or through a representative is engaged in and
is responsible for the connection, utilization, repair or servicing of gas
utilization equipment or accessories; who is experienced in such work,
familiar with all precautions required, and has complied with all of the
requirements of the authority having jurisdiction.
In Canada: The conversion shall be carried out in accordance with
the requirements of the provincial authorities having jurisdiction
and in accordance with the requirements of the CAN‐B149.1 and
CAN1‐B149.2 Installation Code.
Tools Required:
Phillips Screwdriver
Flathead Screwdriver
/
in or 4 mm Allen Wrench
5
32
Combustion Analyzer or Dual Port Manometer
Gas Leak Detector
Included Items:
Gas Orifice (refer to below table)
NG
Model
1 STAGE
2 STAGE
NHB-055
Ø4.20
NHB-080
Ø4.20
NHB-110
Ø4.25
NHB-150
Ø4.60
Table 1. Orifice Size
Gas Pressure and Conversion Kit Number Labels
LP
1 STAGE
2 STAGE
Ø3.55
Ø3.40
Ø2.80
Ø3.55
Ø3.40
Ø2.80
Ø5.00
Ø3.45
Ø3.85
Ø6.90
Ø3.65
Ø5.25
Procedure:
1. Turn off both gas and water supply to the boiler.
2. Using a Phillips screwdriver, remove 4 screws (2 at the top and
2 at the bottom) of the front cover assembly to gain access to
the internal components. See Figure 1 for illustration of the
front cover on the unit.
Figure 1. NHB Series Front cover
3. Remove the front cover and place it in a safe location to
prevent accidental damage.
4. Label all the wires on the PCB.
5. Disconnect all the wires.
6. Loosen the three screws indicated in the figure.
Appendixes