(For P50T01U, P50T01E, P50TP01U and P50TP01E)
To SP
To SP
EFAC Preparation:
Secureyl insert Faston of EFAC in the
PS Process
terminal of the inlet as follows:
SM016
P50T01U/E P50TP01U/E
To Power Unit
To Power Unit
Slot Board
Filter Board
To LED Board
To LED Board
WIRING DIAGRAM - 2
31
To Power Unit
To Power Unit
Insert ECN1 (LVDS Cable)
in MAIN Board, EC01 first.
Main Board
To Control Board
To Control Board
To Power Unit
To Power Unit
To SP
NOTES:
1. This drawing shows connection
and wire styling.
2. This drawing shows the rear
view of the set.
To SP
3. Securely lock the lead holder
in place.
4. Cores and SK binders with ( )
round brackets should be
delivered integrated with
harness.