To perform a long term pressure test including the
boiler, ALL trapped air must fi rst be removed from
the boiler.
Figure 14: Recommended Piping for Combination Heating and Cooling (Refrigeration) System
24
A loss of pressure during such a test, with no visible
water leakage, is an indication that the boiler
contained trapped air.