Chapter 2
Switch Installation
Figure 2-51
1
Phillips-head screw
Remove the XENPAK module from the protective packaging.
Step 4
Align the XENPAK module with the guide rails inside the module slot, and slide the module into the
Step 5
opening until the back of the XENPAK faceplate is flush with the switch faceplate. (See
Figure 2-52
1
1
Optical bore dust plug
Secure the XENPAK module in place by tightening the two captive installation screws. Do not
Step 6
overtighten the captive screws.
OL-6336-06
Removing the XENPAK Module Slot Cover
1
2
2
Module slot cover
Installing a XENPAK Module in the Catalyst 3750G-16TD Switch
T X
R X
2
2
Captive installation screw
Installing and Removing XENPAK Modules
C a ta ly s t 3
7 5 0
s e ri e s
1
C a ta ly s t 3
1
Catalyst 3750 Switch Hardware Installation Guide
Figure
2-52.)
7 5 0
s e ri e s
2-39