Daewoo FRS-U20DD. Service Manual page 38

Hide thumbs Also See for FRS-U20DD.:
Table of Contents

Advertisement

8-4. Dispenser Solenoid Valve
1) Disassembling Procedure
NO
DISASSEMBLING PROCEDURE
1
- Insert (-) screw driver into bottom left groove
of Cover Dispenser Box. Pull forward with a
snap.(Be careful not to damage cover and
door surface.)
2
- Separate 2 housings of 10P / 7P
from Front PCB.
(Do not hold only wires to pull out.)
3
- Unscrew (2 points) to remove Box
Dispenser Shut.
2) How to Check Micro Switch
PARTS
- SPEC. NAME
:SOL2003-01B
Dispenser
- VOLTAGE
Sol Valve
:220/240V,50Hz
Flap Heater
- VOLTAGE
Assembly
:DC 12V,1.5W
SPEC.
- Check resistance value of
both terminals with a tester.
- Check resistance value of
both terminals with a tester.
NO
DISASSEMBLING PROCEDURE
4
- Separate 2 terminals from Sol Valve and
2P Housings from Cover Ice Flap.
5
- Unscrew (3 points) to remove Sol Valve.
6
- Unscrew (1 point) to remove Cover Ice Flap.
HOW TO CHECK
38
CRITERION
- Good : 215 ohm(+-10%)
(193 ~ 236 ohm)
- DEFECTIVE : 0
Change Sol Valve.
- GOOD : 96Ω(±8%)
(88 ~ 104Ω)
- DEFECTIVE ;
Change Flap Heater AS.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents