Assembly; Installation - Jet JMD-15 Operating Instructions And Parts Manual

Mill/drill machine
Hide thumbs Also See for JMD-15:
Table of Contents

Advertisement

7.0 Assembly

1. Screw rubber handles (A, Fig. 1) onto
handle rod (B, Fig. 1). Screw handle rod
into downfeed hub (C, Fig. 1) and tighten.
Flat
spot
on
rod
combination or adjustable wrench.
Handle shafts are already installed into hub
on JMD-18PFN.
2. Repeat for other two rod assemblies.
3. Slide crank (D, Fig. 2) onto shaft and tighten
set screw (E, Fig. 2). Be sure set screw
seats on flat part of shaft.
4. Thread handle (F, Fig. 2) into crank and
tighten.
5. Slide handwheel (G, Fig. 3) onto table
handwheel shaft and tighten set screw.
Insert handle (H, Fig. 3) into handwheel and
tighten.
6. Repeat for two remaining table hand wheels.
7. Install spindle guard assembly (Figure 3a).

8.0 Installation

Machine is heavy! Use an
appropriate lifting device and use extreme
caution when moving the machine to its final
location. Failure to comply may cause
serious injury.
1. The location for the mill/drill should be well
lit, dry, and have room enough to allow the
head to rotate 360°.
2. Before bolting the mill/drill to a bench or
stand, the unit must be level in both
directions. Place a level on the table in both
directions.
3. If the table is not level, shim under the low
corner(s) until level. Tighten the fastening
bolts.
Check for level again.
necessary until the mill/drill is level after the
fastening hardware has been tightened.
accommodates
a
Note:
Adjust as
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmd-18Jmd-18pfn350017350018350020

Table of Contents