Maintenance Manual
O-360 and IO-360 Series Engines
UNTIL THE INSTALLATION IS COMPLETED.
FAILURE TO COMPLY COULD RESULT IN
BODILY INJURY WHEN THE PROPELLER IS
ROTATED DURING INSTALLATION.
2
72-00-10
© February 2007 Superior Air Parts Inc.
Engine Installation