Specifications; What To Do Before Operation; Remote Controller: Name And Function Of Each Switch And Display - Daikin RTSYQ10PAY1 Operation Manual

Daikin vrv iii-c system air conditioner operation manual
Table of Contents

Advertisement

• Make sure that there are no obstacles close to
the outdoor unit.
Obstacles close to the outdoor unit may drop the
performance of the outdoor unit or an increase in
the operating sound of the outdoor unit.
• Consult your dealer if the air conditioner in
operation generates unusual noise.
[Drainage through Drainpipe]
• Make sure that the drainpipe is installed prop-
erly to drain water.
If no water is discharged from the drainpipe while
the air conditioner is cooling operation, the drain-
pipe may be clogged with dust or dirt and water
leakage from the indoor units may result.
Stop operating the air conditioner and consult your
dealer.

2. SPECIFICATIONS

Model
System name
Indipendent unit
Power supply
-
Phase
Frequency
(Hz)
(V)
Voltage
Nominal cooling capacity (kW)
Nominal heating capacity (kW)
(mm)
Dimensions H×W×D
Mass
(kg)
Refrigerant
type
-
(kg)
charge (*1)
Design pressure
High side
(bar)
(MPa)
Low side
(bar)
(MPa)
Model
System name
Indipendent unit
Power supply
Phase
-
Frequency
(Hz)
Voltage
(V)
Nominal cooling capacity (kW)
Nominal heating capacity (kW)
(mm)
Dimensions H×W×D
(kg)
Mass
Refrigerant
type
-
(kg)
charge (*1)
Design pressure
High side
(bar)
(MPa)
Low side
(bar)
(MPa)
*1: Refrigerant charge at factory shipment
4
RTSYQ10PAY1
RTSYQ14PAY1
RTSQ10PAY1
RTSQ14PAY1
BTSQ20PY1
BTSQ20PY1
~
~
3N
3N
50
50
380-415
380-415
28.0
40.0
31.5
45.0
1680×930×765
1680×1240×765
+1570×460×765
+1570×460×765
257+110
338+110
R410A
R410A
10.5
11.7
40
40
4.0
4.0
33
33
3.3
3.3
RTSYQ16PAY1
RTSYQ20PAY1
RTSQ16PAY1
RTSQ8PAY1
BTSQ20PY1
RTSQ12PAY1
BTSQ20PY1
~
~
3N
3N
50
50
380-415
380-415
45.0
56
50.0
63
1680×930×765
1680×1240×765
+1680×930×765
+1570×460×765
+1570×460×765
344+110
205+257+110
R410A
R410A
11.7
9.4+10.9
40
40
4.0
4.0
33
33
3.3
3.3
[INFORMATION RELATED ENVIRONMENT]
This product contains fluorinated greenhouse gases
covered by the Kyoto protocol.
Type of refrigerant: R410A, GWP(*) value: 1975
(*)GWP=global warming potential
Periodical inspections on refrigerant leakages may
be required depending on European or local legisla-
tion.
Please contact your installer for more information.

3. WHAT TO DO BEFORE OPERATION

This operation manual is for the following system
with standard control. Before initiating operation,
contact your Daikin dealer for the operation that cor-
responds to your system type and mark.
If your installation has a customized control system,
ask your Daikin dealer for the operation that corre-
sponds to your system.
Outdoor units (Refer to figure 1)
Inverter series
Heat pumps RTSYQ series
• Names and functions of parts (Refer to figure 1)
1. Outdoor unit
2. Indoor unit
3. Remote controller
4. Inlet air
5. Outlet air
6. Refrigerant piping
4. REMOTE CONTROLLER: NAME
AND FUNCTION OF EACH
SWITCH AND DISPLAY
(Refer to figure 2)
1. On/off button
Press the button and the system will start. Press
the button again and the system will stop.
2. Operation lamp (red)
The lamp lights up during operation.
3. Display "
" (changeover under control)
It is impossible to changeover heat/cool with the
remote controller which display this icon.
Refer to the chapter "6-5 SETTING THE MAS-
TER REMOTE CONTROLLER".
4. Display "
" (airflow flap)
Refer to the chapter "6-3 ADJUSTING THE AIR-
FLOW DIRECTION".
5. Display "
This display shows that the ventilation unit are in
operation. (these are optional accessories)
Operation modes
" (ventilation/air cleaning)
English

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rtsyq14pay1Rtsyq20pay1Rtsyq16pay1

Table of Contents