When replacing any part on this appliance, use only spare parts that you can be assured conform to the safety and performance specification that we require. Do not use reconditioned or copy parts that have not been clearly authorised by Ideal.
Benchmark Commissioning Checklist. You can check your installer by calling Gas Safe Register direct on 0800 4085500. Ideal stelrad group is a member of the Benchmark scheme and fully supports the aims of the programme. Benchmark has been introduced to improve the standards of installation and commissioning of central heating systems in the UK and to encourage the regular servicing of all central heating systems to ensure safety and efficiency.
The gauge (E) indicates the central heating system pressure. If Boiler ConTrols Legend a. CH Temperature Control D. Burner ‘on’ Indicator g. Economy Mode B. Mode Control E. Pressure Gauge C. Boiler Status F. Condensate Drain Ideal Logic System - User’s...
The boiler has a call for central heating / hot water but the appliance has reached the desired temperature set on the boiler. The boiler is operating for central heating / hot water. The boiler is operating in frost mode. continued ..Ideal Logic System - User’s...
5 Boiler Resets in 15 minutes 1. Turn power off and on at the fused spur. 2. If the boiler fails to operate please contact Ideal (if under warranty) or alternatively a Gas Safe Registered Engineer if outside of the warranty period.
Page 6
Ideal stelrad group pursues a policy of continuing improvement in the design and performance Ideal Consumer Helpline of its products. The right is therefore reserved to vary specification without notice. Tel: 01482 498660 Ideal, P.O. Box 103, National Ave, Kingston Upon Hull, HU5 4JN.