ELECTRICITY SUPPLY

This appliance must be earthed.
Supply: 230 V ~ 50 Hz. The fusing should be 3A.
Important Notes
This appliance must not be operated without the casing correctly fitted and forming an adequate seal.
If the boiler is installed in a compartment then the compartment MUST NOT be used for storage purposes.
If it is known or suspected that a fault exists on the boiler then it MUST NOT BE USED until the fault has been corrected
by a Gas Safe Registered Engineer or in IE a Registered Gas Installer (RGII).
Under NO circumstances should any of the sealed components on this appliance be used incorrectly or tampered with.
This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities,
or lack of experience and knowledge, unless they have been given supervision or instructions concerning use of the
appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
In cases of repeated or continuous shutdown a Gas Safe Registered Engineer or in IE a Registered Gas Installer (RGII)
should be called to investigate and rectify the condition causing this and carry out an operational test. Only the manufacturers
original parts should be used for replacement.

MINIMUM CLEARANCES

Clearances of 165mm (6 1/2") above, 100mm (4") below, 2.5mm (1/8") at the sides and 450mm (17 3/4") at the front of the
boiler casing must be allowed for servicing.
Bottom clearance
Bottom clearance after installation can be reduced to 5mm.
This must be obtained with an easily removable panel, to enable the consumer to view the system pressure gauge, and to
provide the 100mm clearance required for servicing.