Shut Down And Clean-Up; Taking A Break; Winterizing And Long-Term Storage - Kärcher HD 2700 DB Operator's Manual

Karcher high pressure washer operator manual
Hide thumbs Also See for HD 2700 DB:
Table of Contents

Advertisement

SHUTTING DOWN & CLEAN-UP
Step 1
Remove deter-
gent suction tube from con-
tainer and insert into one gallon
of fresh water. Siphon water at
low pressure for one minute.
7
Step 5
Press
trigger to release
water pressure.
TAKING A BREAK... five minutes or more
Step 1
Turn off
the engine.

WINTERIZING AND LONG-TERM STORAGE

1. Disconnect all water connections.
2. Start the machine for a few seconds,
until the remaining water exits.
Turn off immediately.
3. Drain the gas and oil from the engine.
4. Do not allow high pressure hose
to become kinked.
Step 2
off the engine.
Step 6
Disconnect
garden hose from water
inlet on the unit.
Step 2
Slide
fuel valve to the
off position.
Step 3
Turn
fuel valve to the
off position.
Step 7
Disconnect
high pressure hose from
high pressure outlet.
Step 3
Press
trigger to release
water pressure.
5. Store the machine and accessories in
a room which does not reach freezing
temperatures.
Caution: Failure to follow the above
directions will result in damage to the
pump assembly and accessories.
Step 4
Slide
off water supply.
Step 8
Engage the gun
safety lock.
Step 4
gun safety lock.
Turn
Engage

Advertisement

Table of Contents
loading

Table of Contents