Step 11. Connecting the Power

To connect the power, do the following:
1. Plug the drawer power cords into the PDB (power distribution bus) of the rack.
2. Plug the power cords of the external devices into power outlets.
3. Plug the PDB power cord into the customer's electrical outlet.

Step 12. Installing a System with Capacity Upgrade on Demand

If you are installing a system that was ordered with a processor Capacity Upgrade on
Demand feature, go to Chapter 3, "Using the Capacity Upgrade on Demand Feature" on
page 41. Then return here and continue with Chapter 2, "Installing Options In Your
System" on page 27.

Step 13. Installing Options

If you have any options to install, go to Chapter 2, "Installing Options In Your System"
on page 27 and install them at this time.
Return here after installing your options.

Step 14. Starting the Operating System

If you plan to install the AIX operating system now, refer to the AIX Installation Guide ,
order number SC23-4112.
If the AIX operating system was preinstalled on your system, go to the AIX System
Management Guide: Operating System and Devices . This publication is available at the
following Web address: http://www-1.ibm.com/servers/aix/library/. Select Technical
Publications.AIX documentation is also located on the AIX Documentation CD. The
documentation information is made accessible by loading the documentation CD onto
the hard disk or by mounting the CD in the CD-ROM drive.
To turn on the CEC drawer and attached I/O drawers, do the following:
1. Open the rack door. Look for OK in the primary I/O drawer operator panel display,
which indicates that the system is in standby mode.
2. Press the power button on the primary I/O drawer operator panel.
The power LED on the primary I/O drawer operator panel starts blinking at a fast rate.
Checkpoint codes (9xxx) appear in the operator panel display.
When the power-on sequence is complete:
v The power LED on the primary I/O drawer operator panel stops blinking and stays
on.
v The power LED on the CEC drawer stops blinking and stays on.