Install The Boiler; Install The Flue; Installation - Potterton Kingfisher Mf Installation & Service Instructions Manual

Hide thumbs Also See for Kingfisher Mf:
Table of Contents

Advertisement

2. Installation

2.1

Install the boiler

These instructions assume you have decided
on where the boiler will be located and the
type of flue system to be used.
1. Carefully unpack the boiler. Remove and
place aside the tailpipe/gravity stat kit and
on CFL boilers, the ancillary bag
containing the top and rear blanking
plates with seal and control panel.
2. Do not discard any packaging until all the
items are accounted for.
3. Temporarily position the boiler to ensure
where required, the top cover touches the
wall. This sets the minimum rear
clearance for the pipework. Mark the
position on the floor.
4. Remove the plinth - 2 screws.
5. Remove the front door - 2 screws, unhook
and lift off.
6. Remove the controls panel - open flap,
remove screw, unhook, disconnect the in-
line connector and lift away.
7. Remove the top cover - 2 screws, pull
forward and lift off.
2.2

Install the flue

Install the flue type as required.
Conventional Flue:
1. Loosen the 4 screws securing the flue
spigot to the boiler, line the spigot up with
the flue and fully tighten the screws.
Note: From its fully rearward position the
spigot will move forward 50mm.
Publication No. 5102977
Fig. 11
Fig. 12
Installation
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents