c)
Insert the modular plug into the Cell Station, and attach the ferrite core (included) to the
plug cord.
Ferrite Core
Roll the cord once
around the ferrite core
and close the core.
d)
Survey the site for the Cell Station by testing the radio signal. Refer to the Section
5.2.5 Site Survey.
Note
• System Programming is required to assign an extension number to each portable
station. <SYS PRG [650], [671]>
• For the KX-TD146, an AC adapter (KX-A277) is necessary.
The same AC outlet should be used for the main PBX unit and a Cell Station
Interface Unit.
Wrap the cord once around
the upper hook and pass
through the lower hook.
DECT Installation
15 cm
5.2 Wireless System Installation
161