Potterton NXR4 Installation, Operation & Maintenance Manual page 5

Table of Contents

Advertisement

SECTION 1
PAGE 4
CLEARANCES
The minimum boiler room clearances for access, erection and maintenance are given in Fig.2 and Fig.3, the
dimensions are minimum values. There is no minimum clearance above the boiler, however, it is recommended
that clearance is left above the top of the instrument panel to facilitate its removal. At the front of the boiler allow as
a minimum the A dimension, this is to allow access to the combustion chamber for maintenance and servicing. For
P dimension please refer to relevant burner card.
Fig.2 – Boiler Clearances
Nu-Way Oil
Model
A (mm)
409
1580
410
1580
411
1580
412
1580
413
1542
414
1542
415
1542
416
1686
417
1686
No special plinth is required for
this boiler, a simple dry base is
sufficient. Boiler footprint and
base clearance details are given
in Fig.3.
Fig.3 – Boiler Footprint/Base Details
1070
450
POTTERTON COMMERCIAL PRODUCTS DIVISION
INSTALLATION, OPERATION & MAINTENANCE MANUAL
Minimum Clearance (Front)
Nu-Way Gas
A (mm)
1733
1733
1733
1733
1885
1885
2183
2183
2183
A
B
Provision must be made to allow free movement of the boiler on
its base.
*NOTE: Base MUST NOT protrude from rear of boiler.
A
B
150mm x 6mm Flat
Plate (Not Supplied
by Potterton)
Riello Oil
Riello Gas
A (mm)
A (mm)
1555
1725
1555
1725
1600
1725
1600
1785
1610
1785
1610
1785
1610
2000
1950
2000
1950
2100
700
409
410
411
412
1320
1460
1600
1740
1540
1680
1820
1960
NXR4
EOGB Oil
EOGB Gas
A (mm)
A (mm)
1807
1810
1807
1810
1807
1810
1807
1810
2086
2296
2086
2296
2086
2296
2086
2296
2086
2296
500 min
P
A
P + 200
413
414
415
416
1880
2020
2160
2300
2100
2240
2380
2520
417
2440
2660

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents