Planning Considerations
Specific Considerations for the 5400zl/8200zl Switches
Specific Considerations for the 5400zl/
8200zl Switches
The following is an example list of considerations during the planning phase
specific to the 5400zl/8200zl Switches:
■
■
■
■
A-6
What if power is lost to the switch?
•
Power for the switch to operate (system power)
•
Power for PoE devices
Which devices to plug into which ports, modules, and with what priorities?
•
Slot prioritization
•
Port prioritization
•
Port priority class
•
Reserve watts
•
Total watts available
Which modules will be used for PoE and which will not?
Will load balancing be used?