Pre-Operation Instructions; Pre-Operation Instructions Unpacking And Checking The Product; Product Confirmation - Mitsubishi Electric FR-A8AX Instruction Manual

Hide thumbs Also See for FR-A8AX:
Table of Contents

Advertisement

1

PRE-OPERATION INSTRUCTIONS

1.1
Unpacking and checking the product
Take the plug-in option out of the package, check the product name, and confirm that the product is as you ordered and intact.
This product is a plug-in option dedicated for the FR-A800 series.
1.1.1

Product confirmation

Check the enclosed items.
Plug-in option
..................................................1
Mounting screws (M3  8 mm)
.....................2 (Refer to
page
8.)
Spacer
....................2 (Refer to
page
8.)
PRE-OPERATION INSTRUCTIONS
1
5

Advertisement

Table of Contents
loading

Table of Contents