11
SERVICE WORK ON THE CHASSIS
11.12
Adjusting the play of the steering head bearing
11.13
Greasing the steering head bearing
11.14
Removing the start number plate
Preparatory work
–
Raise the motorcycle with the lift stand. (
–
Remove the handlebar cushion.
Main work
–
Loosen screws
–
Loosen and retighten screw
Guideline
Screw, top steering head
–
Using a plastic hammer, tap lightly on the upper triple clamp to avoid strains.
–
Tighten screws
Guideline
B02093-10
Screw, top triple clamp
–
Mount and tighten screw
Guideline
Screw, top steering stem
Finishing work
–
Check the play of the steering head bearing. (
–
Remove the motorcycle from the lift stand. (
–
Mount the handlebar cushion.
x
–
Remove the lower triple clamp.
–
Install the lower triple clamp.
800010-10
–
Remove screw
–
Remove screw
L00947-10
x
. Remove screw
.
.
.
.
M8
(
p. 42)
x
(
p. 42)
x
and take off the clamp.
. Take off the start number plate.
p. 39)
M20x1.5
12 Nm (8.9 lbf ft)
M8
17 Nm
(12.5 lbf ft)
Loctite
17 Nm
(12.5 lbf ft)
p. 44)
p. 39)
45
®
243™