 To install, insert the panel arm into the slot on the
front panel from the position shown in right
illustration, hold the panel at both ends of lower
part, lower it downward slowly, then push it
slightly until the latch warks.
ELECTRICAL WIRING WORK
Preparation of indoor unit
In case of faulty wiring connection, the indoor unit stops, and
then the run lamp turns on and the timer lamp blinks.
Mounting of connecting wires
Open the air inlet panel.
Use cables for interconnection wiring to avoid loosening of the
Remove the service panel.
wires.
Remove the wiring clamp
CENELEC code for cables Required field cables.
Connect the connecting wire securely to the terminal block.
H05 RNR4G1.5 (example) or 245IEC57
1 ) Connect the connection wire securely to the terminal
H
block. If the wire is not affixed completely, contact will be
05
poor, and it is dangerous as the terminal block may heat
R
up and catch fire.
N
2 ) Take care not to confuse the terminal numbers for indoor
R
and outdoor connections.
4or5 Number of conductors
3 ) Fix the connection wire using the wiring clamp.
G
Fix the connecting wire by wiring clamp.
Attach the service panel.
1.5
Close the air inlet panel.
INSTALLATION OF REMOTE CONTROL SWITCH
Mounting method of battery
CAUTION
Battery
Do not use new and
old batteries together.
Cover
HOW TO RELOCATE OR DISPOSE OF THE UNIT
In order to protect the environment, be sure to pump down (recovery of refrigerant).
Pump down is the method of recovering refrigerant from the indoor unit to the
outdoor unit when the pipes are removed from the unit.
<How to pump down>
Connect charge hose to service port of outdoor unit.
Liquid side : Close the liquid valve with hexagon wrench key.
Gas side : Fully open the gas valve
Carry out cooling operation . (If indoor temperature is low, operate
forced cooling operation.)
After low pressure gauge become 0.01MPa, stop cooling operation
and close the gas valve.
CAUTION
Harmonized cable type
300/500 volts
Natural-and/or synth, rubber wire insulation
Polychloroprene rubber conductors insulation
Stranded core
One conductor of the cable is the earth conductor
(yellow/green)
Section of copper wire (mm
2
)
Fixing to pillar or wall
Conventionally, operate the remote control switch by holding in your hand.
Avoid installing it on a clay wall etc.
Wireless remote control
Wood screw
3.5 16
Forced cooling operation
Turn on a power supply again after a while after turn off a power supply.
Then press continually the ON/OFF button 5 seconds or more.
Unit ON/OFF button
Cover the body with the front panel.
Fit the 4 latches in the upper section.
Tighten the 5 set screws.
Fit the air filter.
Fit the air input panel.
Installing the air-cleaning filters
1. Open the air inlet panel and remove the air filters.
2. Install the filter holders, with the air-cleaning filters installed in the holders.
Service panel
3. Install the air filters and close the inlet panel.
Terminal block
Clamp
INSTALLATION TEST CHECK POINTS
Check the following points again after completion of the installation, and before turning on the power. Conduct a test run again and ensure that the unit operates properly.
At the same time, explain to the customer how to use the unit and how to take care of the unit following the user's manual.
After installation
The power supply voltage is correct as the rating.
No gas leaks from the joints of the operational valve.
Power cables and crossover wires are securely fixed to the terminal board.
Operational valve is fully open.
The pipe joints for indoor and outdoor pipes have been insulated.
Test run
Air conditioning operation is normal.
No abnormal noise.
Water drains smoothly.
Protective functions are not working.
The remote control is normal.
CONCERNING TERMINAL CONNECTION FOR AN INTERFACE
Remove the front panel and lid of control.
There is a terminal (respectively marked with CNS) for the indoor control board.
In connecting an interface, connect to the respective terminal securely with the connection harness supplied
with an optional "Interface connection kit SC-BIKN-E" and fasten the connection harness onto the indoor control
box with the clamp supplied with the kit.
For more details, please refer to the user's manual of your "Interface connection kit SC-BIKN-E".
In the air conditioner.
• Each air-cleaning filter can be installed in the left or right filter holder.
Filter holder
Air-cleaning filter
Operation of the unit has been explained to the customer.
(Three-minutes restart preventive timer)
When the air conditioner is restarted or when changing the operation, the unit
will not start operating for approximately 3 minutes.
This is to protect the unit and it is not a malfunction.