4. Next check the molded plug.
A.
Voltage check: Apply control voltage to the plug
wires (18 to 28 volt ac). The measured dc voltage
at the female connectors in the plug should be
around 15 to 27 vdc.
B.
Resistance check: Measure the resistance from
the end of one molded plug lead to either of the two
female connectors in the plug. One of the connec-
tors should read close to zero ohms while the other
should read infinity. Repeat with other wire. The
same female connector as before should read zero
while the other connector again reads infinity.
Reverse polarity on the ohmmeter leads and re-
peat. The female connector that read infinity previ-
ously should now read close to zero ohms.
C.
Replace plug if either of these test methods doesn't
show the desired results.

S-17D OPERATION TEST

If the voltage, capacitor, overload and motor winding test fail
to show the cause for failure:
HIGH VOLTAGE!
Disconnect ALL power before servicing
or installing this unit. Multiple power
sources may be present. Failure to do so
may cause property damage, personal injury
or death.
1. Remove unit wiring from disconnect switch and wire a test
cord to the disconnect switch.
NOTE: The wire size of the test cord must equal the line wire
size and the fuse must be of the proper size and type.
2. With the protective terminal cover in place, use the three
leads to the compressor terminals that were discon-
nected at the nearest point to the compressor and
connect the common, start and run clips to the respective
leads.
3. Connect good capacitors of the right MFD and voltage
rating into the circuit as shown.
4. With power ON, close the switch.
WARNING
Line Voltage now present.
A. If the compressor starts and continues to run, the cause
for failure is somewhere else in the system.
B. If the compressor fails to start - replace.
S-18 TESTING CRANKCASE HEATER
(OPTIONAL ITEM)
The crankcase heater must be energized a minimum of four
(4) hours before the condensing unit is operated.
Crankcase heaters are used to prevent migration or accumu-
lation of refrigerant in the compressor crankcase during the
off cycles and prevents liquid slugging or oil pumping on start
up.
A crankcase heater will not prevent compressor damage due
to a floodback or over charge condition.
WARNING
Disconnect ALL power before servicing.
1. Disconnect the heater lead in wires.
2. Using an ohmmeter, check heater continuity - should
test continuous. If not, replace.
S-100 REFRIGERATION REPAIR PRACTICE
DANGER
Always remove the refrigerant charge in a proper
manner before applying heat to the system.
When repairing the refrigeration system:
WARNING
Disconnect ALL power before servicing.
1. Never open a system that is under vacuum. Air and
moisture will be drawn in.
2. Plug or cap all openings.
3. Remove all burrs and clean the brazing surfaces of the
tubing with sand cloth or paper. Brazing materials do not
flow well on oxidized or oily surfaces.
4. Clean the inside of all new tubing to remove oils and pipe
chips.
5. When brazing, sweep the tubing with dry nitrogen to
prevent the formation of oxides on the inside surfaces.
6. Complete any repair by replacing the liquid line drier in
the system, evacuate and charge.
BRAZING MATERIALS
Copper to Copper Joints - Sil-Fos used without flux (alloy
of 15% silver, 80% copper, and 5% phosphorous). Recom-
mended heat 1400°F.
Copper to Steel Joints - Silver Solder used without a flux
(alloy of 30% silver, 38% copper, 32% zinc). Recommended
heat - 1200°F.