Installation And Connection; Ground; Anchoring; Water Connection - IPSO WE181 Operating Instructions Manual

With electronical timer µ20
Table of Contents

Advertisement

Installation and connection

Surface

Anchoring

E
F
C
B
A
E
B
A

Water connection

The machine must be securely fixed on a flat surface (metal base, concrete or
solid ground). The anchoring is to be done on the provided places (A) in the base.
(See Dimensions 2)
The machine must be placed entirely level. For easy maintenance it is recom-
mended to keep a minimal distance of 600 mm between the wall and the back
of the machine.
If several machines are placed next to each another, there should be a minimal
distance of 30 mm between each machine.
On a metal base
The machines must be fixed on a metal base which is securely anchored on a
D
concrete base.
C
A: Bolt M16
B: Concrete base 40cm
D
C: Washer 40x17x4
D: Nut M16
G
E: Base of the machine
F: Metal base
Directly on the ground
The machine must be anchored directly on a concrete base.
D
A: Bolt M16
C
B: Concrete base 40cm
C: Washer 40x17x4
D: Nut M16
E: Base of the machine
The machine is delivered with hoses with 3/4" connections. These hoses fit the
water inlet valves of the machine and the main water inlet taps. To ensure the
optimal functioning of the water inlet valves, the water pressure on the inlet
should be between 0,5 and 10 kg/cm² (7 and 145 psi). If the pressure is too low,
the cycle time will increase considerably.
In case of boiler fed machines, a minimum of 145 l. hot water of 90°C should be
available.