Installing Power Cord Clip - D-Link DGS-3000-10TC Hardware Installation Manual

Dgs-3000 series layer 2 managed gigabit ethernet switch
Table of Contents

Advertisement

DGS-3000 Series Layer 2 Managed Gigabit Ethernet Switch Hardware Installation Guide

Installing Power Cord Clip

To prevent accidental removal of the AC power cord, it is recommended to install the power cord clip together with the
power cord.
1. With the rough side facing down, insert the Tie Wrap into the hole below the power socket.
2. Plug the AC power cord into the power socket of the Switch.
Figure 2-6 Insert Tie Wrap to the Switch
Figure 2-7 Connect the power cord to the Switch
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-3000-24tcDgs-3000-26tc

Table of Contents