Operational Flow Diagrams - Worcester 24ijunior Installation And Servicing Instructions

Wall mounted combination boilers for central heating and mains fed domestic hot water
Table of Contents

Advertisement

18. Operational Flow Diagrams

CENTRAL HEATING FUNCTION
Pump on.
Fan ON/
CENTRAL
ignition
HEATING
sequence.
DEMAND
Burner Light
On.
Three minute
wait
DOMESTIC HOT WATER FUNCTION
DOMESTIC
HOT WATER
Is CH
DEMAND
interrupted?
(Priority over
CH demand)
DHW temp
drops to
<55°C
Primary
78°C
MAIN SWITCH
ON
19 second
minimum
burner
pressure then
ramp up
pressure over
next one
minute
Gas valve Off.
Burner light
off. (Pump still
On)
MAIN SWITCH
ON
Pump continue
4 seconds if
YES
primary temp
above DHW
setting. Burner
to MAX.
NO
Ignition
sequence and
burner to MAX
Gas valve off.
Gas valve off.
Pump on
Room
thermostat
and/or mains
programmer
(or link) On
AND
facia
programmer
(if fitted) On
AND
CH control
knob On
Modulate gas
to maintain
flow
temperature
set by control
knob
(50-82°C)
Over tempera-
ture shut-
down if flow
temperature
5°C above set
value
Flow sensor
signal
(Tap open)
Modulate gas
to maintain
delivered
water
temperature
(55°C)
Over
temperature
shut-down if
water
temperature
above 80°C
Primary
temperature
94°C
33
DEMAND
Overrun
END
function
(see overleaf)
Overrun
DEMAND
function
END
(see overleaf)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

28i junior24i junior

Table of Contents