Monitoring and Controlling
c
Select Schedule, and then press the [
The Schedule Settings screen is displayed. The indicator appears at
the time when an event is saved.
•
(Aqua): Single event
•
(Orange): Regular event
•
(Green): Communication monitoring ON/OFF
•
(Gray): Disabled event
] button.
Editing a Schedule
d
Use the [ ] [ ] buttons on the remote control or the [Tele]/[Wide]
buttons on the control panel to highlight the date you want to
check.
The details of the events registered that day are displayed.
•
(Blue): Enabled event
•
(Gray): Disabled event
•
: Regular event
a
Press the [Menu] button while projecting.
"Using the Configuration Menu"
s
Using Remote Control
168
p.172
Using the Control Panel