UTICA BOILERS UB90-200 Installation, Operation & Maintenance Manual page 32

125-200 gas-fired, direct vent, condensing, hot water boiler
Table of Contents

Advertisement

DETAILED SEQUENCE OF OPERATION
End Of Normal Sequence Of Operation
Thermostat ends call for heat.
Gas valve and circulator pump are
de-energized, valve and fl ame lights go out.
Blower runs for 30 seconds post purge,
purge light is on.
Blower is de-energized after 30 seconds,
purge light shuts off.
Boiler stand by for next call for heat.
32

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ub90 125Ub90 200Ub90 150Ub90 175

Table of Contents