Horizontal Drain Trap Mounting (Left Or Right Side Panel) - Amana GUCA Installation Instructions Manual

Gas fired warm air furnace
Hide thumbs Also See for GUCA:
Table of Contents

Advertisement

3. Secure Hose A to front cover drain port with a red hose
clamp. Route hose to rear left (down) side panel grom-
met holes. NOTE: For left side drainage, grommets
must be relocated to left side panel.
FRONT
COVER
PRESSURE
TAP
LEFT SIDE
FRONT COVER
PANEL
DRAIN PORT
RED HOSE CLAMP
SIDE PANEL
Horizontal Connections
Left Side Down
(Upflow Shown, Counterflow Similar)
4. Cut "X" inches from the long end of Hose B and discard.
Refer to table below for appropriate length to cut.
Cabinet Width
Model
(inches)
(kBTU Tons)
045__30
16 1/2
070__30
070__40
20 1/2
090__40
090__50
24 1/2
115__50
5. Secure short end of Hose B to induced draft blower
drain port using a green hose clamp. Route hose to
front left (down) side panel grommet holes.
6. Cut 5 1/2 inches straight length from the long end of
each Tube 2.
7. Upflow Units with a 16 1/2" cabinet width.
Insert approximately one inch of cut Tube 2 through left
side panel grommet hole and secure to Hose A with a
hose clamp. Insert remaining Tube 2 through other
grommet hole and splice to Hose B with Tube 1, green
hose clamps and a short section of hose as shown
below. NOTE: Tube must reach bottom of trap.
INDUCED
DRAFT BLOWER
DRAIN PORT
HOSE B
HOSE A
GREEN HOSE
CLAMPS
(3 PLACES)
TUBE(S) 2
DRAIN TRAP
GROMMET
HOLES
"X" Length Cut From
Long End of Hose B
(inches)
8 inches
4 inches
None
Junction Box
Tube Installation with Green Hose Clamps
Counterflow Units with a 16 1/2" cabinet width.
Insert approximately one inch of cut Tube 2 through left
side panel grommet hole and secure to Hose A with a
hose clamp. Insert uncut Tube 2 through remaining
grommet hole and secure to Hose B with a green hose
clamp. NOTE: Tube must reach bottom of trap.
All Units with a 20 1/2" and 24 1/2" cabinet width.
Insert approximately one inch of each Tube 2 through
left side panel grommet hole. Secure tubes to Hose A
and Hose B with a green hose clamps. NOTE: Tube
must reach bottom of trap.
NOTE: Ensure hoses and tubes maintain a downward
slope for proper drainage and that they are not kinked or
binding.
For details concerning mounting of the drain trap, refer to
Section X, Condensate Drain Lines and Drain Trap - Up-
right Drain Trap Mounting.
Horizontal Drain Trap Mounting (Left or Right Side
Panel)
1. Position the drain trap against side panel with drain
tubes inserted into trap. Note that the trap may be
orientated with the outlet facing either the furnace's top
cover or base pan.
2. Secure drain trap to side panel at the dimples or
crosshairs located on either side of the grommet drain
holes.
3. Confirm that tubes reach bottom of drain trap and that
all hoses maintain a downward slope and are not
kinked or binding.
4. Attach PVC drain line to drain trap outlet with either a
90° elbow or coupling.
24
Hose B
Tube 1
Short
Section of
Green Hose
Hose
Clamps

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

GulaGcca

Table of Contents