Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Worcester Manuals
Boiler
GREENSTAR 25Si
Installation and servicing instructions
Worcester 25Si Installation And Servicing Instructions page 34
Wall mounted combination boilers for central heating and mains fed domestic hot water
Hide thumbs
Also See for 25Si
:
Installation, commissioning and servicing instructions
(76 pages)
,
Instruction manual
(65 pages)
,
User instructions
(21 pages)
1
Table Of Contents
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
page
of
40
Go
/
40
Contents
Table of Contents
Bookmarks
Table of Contents
Advertisement
With CH control knob
fully clockwise, does
No
the boiler ignite and
appear to run
normally in central
heating mode?
Yes
Red diode is
damaged. Replace
control board.
(Section 15.4.10)
With a hot water tap
fully open, does the
No
boiler ignite and
appear to run
normally in hot water
mode?
Yes
Red diode is
damaged. Replace
control board.
(Section 15.4.10)
No
Is there 230V AC
across terminal ST8
pins LR and N?
Yes
No
Is there a link at
terminal ST13 pins 1
and 2?
Yes
Is there an electronic
No
programmer at
position ST5 at right-
hand end of board?
Yes
Remove programmer
No
connector from board
edge. Does CH lamp
now light?
Yes
Correctly set or
replace electronic
programmer.
Remove multiway
connector from board
No
position ST16. With
tap still open is there
continuity across
contacts 19 and 20
(2 pink wires)?
Yes
Replace control board.
(Section 15.4.10).
34
There is no heat
demand. Check room
thermostat or mains
programmer (or link).
Insert a link
Replace control board.
(Section 15.4.10).
Locate and observe the
flowswitch assembly
(behind the air pressure
switch). Does the lever
No
above the microswitch
move up and down with
the demands, thus
activating and
de-activating the
microswitch?
Yes
Check or replace
wiring or microswitch
Replace flowswitch
assembly
Table of
Contents
Previous
Page
Next
Page
1
...
31
32
33
34
35
36
37
38
Show Quick Links
Quick Links:
Electrical
Installation
Commissioning
Inspection and Servicing
Replacement of Parts
Short Parts List
Fault Finding
Hide quick links:
Permanently
Temporary
Cancel
Advertisement
Table of Contents
Related Manuals for Worcester 25Si
Boiler Worcester Greenstar 25Si Compact Installation, Commissioning And Servicing Instructions
Wall hung rsf gas fired condensing combination boiler (76 pages)
Boiler Worcester GREENSTAR 25Si Instruction Manual
Wall hung rsf gas fired condensing combination boiler (65 pages)
Boiler Worcester 28Si Installation And Servicing Instructions
Wall mounted combination boilers for central heating and mains fed domestic hot water (62 pages)
Water Heater Worcester Greenspring CWi47 Technical And Speci?Cation Information
Greenstar series gas-fired condensing boilers (36 pages)
Boiler Worcester Greenstar Si Compact Series User Instructions
Wall hung rsf gas fired condensing combination boiler (24 pages)
Boiler Worcester greenstar 25si User Instructions
Wall hung gas-fired condensing combination boiler (21 pages)
Boiler Worcester Greenstar 25Si User Instructions & Customer Care Manual
Wall hung gas-fired condensing combination boiler for sealed central heating systems & domestic hot water (20 pages)
Boiler Worcester GREENSTAR CAMRAY KITCHEN 12/18 Instruction Manual
Floor standing oil fired condensing boiler conventional flue & room sealed flue installation commissioning & servicing (77 pages)
Boiler Worcester GREENSTAR CAMRAY EXTERNAL Instruction Manual
Floor standing external oil fired condensing boiler using balanced flue system (60 pages)
Boiler Worcester Greenstar 12/18 Installation, Commissioning And Servicing Instruction Manual
Floor standing oil-fired condensing boiler using room sealed flue, danesmoor external regular & external system (48 pages)
Boiler Worcester greenstar camray 12/18 Instruction Manual
Floor standing oil fired condensing boiler conventional flue & room sealed flue (56 pages)
Boiler Worcester GREENSTAR CAMRAY KITCHEN User Instructions & Customer Care Manual
Floor standing oil fired condensing boiler conventional flue & room sealed flue for fully pumped open vent or sealed central heating systems and domestic hot water cylinders (20 pages)
Boiler Worcester GREENSTAR 25CDi GC Instruction Manual
Wall hung rsf gas-fired condensing combination boiler (60 pages)
Boiler Worcester greenstar heatslave 18 Instruction Manual
Floor standing oil-fired condensing combination boiler (48 pages)
Boiler Worcester Greenstar Danesmoor 25kW User Instructions
Floor standing oil-fired condensing boiler (21 pages)
Boiler Worcester Greenstar Utility 25kW User Instructions
Floor standing oil-fired condensing boiler (21 pages)
Related Products for Worcester 25Si
Worcester 25/32
Worcester Greenstar Heatslave 25/32kW
Worcester GREENSTAR 25CDi GC
Worcester greenstar heatslave 25
Worcester Greenstar Danesmoor 25kW
Worcester GREENSTAR 25CDi
Worcester 28i RSF
Worcester 240 Combi RSF
Worcester GREENSTAR 28i junior
Worcester GREENSTAR 24i junior
Worcester 29CDi GC 47-406-34
Worcester 29CDi GC 47-406-35
Worcester 20
Worcester Greenstar 21i System ErP
Worcester GREENSTAR 29
Worcester 240 Combi BF
This manual is also suitable for:
28si
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL