Inch Concentric Termination Installation - A.O. Smith BTH-120 Instruction Manual

Commercial gas water heaters series 100 & 101
Hide thumbs Also See for BTH-120:
Table of Contents

Advertisement

4 inch concentric termination installation

INTAKE AIR CONNECTION
3 INCH PVC
3" x 3" x 4"
Y FITTING
VENT CONNECTION - 3 INCH PVC
VENT PIPE IS 2 1/2 INCH SDR-26 PIPE
SUPPLIED LENGTH 37 INCHES (94 cm)
MAXIMUM ALLOWABLE LENGTH 73 INCHES (185 cm)
MINIMUM ALLOWABLE LENGTH 25 INCHES (64 cm)
INTAKE AIR PIPE IS 4 INCH SDR-26 PIPE
SUPPLIED LENGTH 24 INCHES (60 cm)
MAXIMUM ALLOWABLE LENGTH 60 INCHES (152 cm)
MINIMUM ALLOWABLE LENGTH 12 INCHES (30 cm)
INTAKE AIR PIPE
Y FITTING ASSEMBLY
VENT PIPE ASSEMBLY
4 INCH CONCENTRIC TERMINATION KIT
FOUR PIECE KIT - FIELD ASSEMBLY REQUIRED
Assemble and install the 4 inch concentric termination. refer to
Figure 29, Figure 30 and Figure 31 for these instructions:
1. Cement the y fitting to the larger diameter intake air pipe.
2. Slide the intake air pipe and y fitting assembly from inside the
building through the hole cut for the termination in the roof
or sidewall. Ensure no foreign materials such as insulation
accumulate inside the assembly.
3. Secure the intake air y fitting assembly using field supplied
metal strapping or equivalent support materials.
4. On installations installed through the roof slide a field
supplied plumbing boot or roof flashing over the intake air y
fitting assembly and secure it to the roof.
5. Seal around the plumbing boot or roof flashing.
6. Cement the vent cap onto the vent pipe. Alternately a field-
supplied stainless steel screw may be used to secure the 2
components together when field disassembly is desired for
cleaning. A pilot hole must be drilled for the screw to prevent
damage/cracking of the vent cap and/or vent pipe.
7. Install the vent cap/vent pipe assembly into the intake air y
fitting assembly, Ensure small diameter vent pipe is cemented
and bottomed in the y fitting.
8. When installing 3 inch intake air and vent piping connect
and cement the pipe directly to the concentric termination.
INTAKE AIR PIPE
VENT PIPE
VENT CAP
VENT CAP
figure 29
When installing 4 inch intake air and vent pipe - connect the
piping to the concentric termination using field supplied 4" x
3" reducer couplings and short sections of 3 inch pipe (18
inches or less) pipe. Cement all fittings and pipe in place.
9. return to Direct Vent Installation on page 25 to complete the
installation of the intake air and vent piping between the
concentric termination and the water heater.
COMBUSTION
AIR
ROOF FLASHING
(field supplied)
VENT
PIPE
4 INCH CONCENTRIC TERMINATION
VERTICAL INSTALLATION
NOTE: SECURING STRAP MUST BE
FIELD INSTALLED TO PREVENT
MOVEMENT OF TERMINATION KIT
IN SIDEWALL.
VENT
(field supplied)
PIPE
INTAKE
AIR PIPE
4 INCH CONCENTRIC TERMINATION
SIDEWALL INSTALLATION
31
VENT
MAINTAIN 12" (30 cm)
18" (45 cm) FOR CANADA
MINIMUM CLEARANCE
ABOVE HIGHEST ANTICIPATED
SNOW LEVEL. MAXIMUM OF
24" (60 cm) ABOVE ROOF.
STRAP
(field supplied)
NOTE: SECURING STRAP
MUST BE FIELD INSTALLED
TO PREVENT MOVEMENT
OF TERMINATION KIT
INTAKE
AIR PIPE
figure 30
COMBUSTION
STRAP
figure 31
AIR
VENT
1 INCH
MAXIMUM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bth-150Bth-199Bth-250

Table of Contents