Loading Documents on the ADF
NOTICE
Be sure to change the position of the shipping lock according to the "Installation and Connection"
procedure before operation.
ADF
Lift up the ADF paper chute and lock
1
the bar in its operating position.
ADF paper chute
Guide
Guide lever
ADF lever
Stacker
Operating position
Bar