Ceiling and Wall Installation

®
Unpack the Gyrolock
location for the Gyrolock
points for a solid structure installation.
NOTE:
Pre-drill all holes (pilot hole – 1/8" drill bit).
Single Stud Installation
1. Locate the center of the single stud where the Gyrolock
points for this installation must be used. Use a stud finder to locate the stud that will be used to mount
the PBL (ceiling or wall). It is advised that all holes be pre-drilled with a 1/8" drill bit.
2. Secure the upper plate to the single stud with the two (2) #14 wood screws (supplied).
3. Start to secure the plate to the outer mounting points first. The plate may travel ½" front to back from
center.
4. Secure the final wood screw to the center of the upper plate (Figure 1).
Page - 6 -
and review any WARNING statements that apply to the installation. Select the desired
®
. There are three mounting points for a single stud installation and four mounting
Figure 1. Single Stud Installation
®
will be installed. The two (2) center mounting
SINGLE STUD
SP-CEIL-012