Mitsubishi Electric PEA-RP100 Installation Manual page 5

Air-conditioners
Hide thumbs Also See for PEA-RP100:
Table of Contents

Advertisement

7
[Fig. 7-1-1]
Ⓐ Air inlet
Ⓒ Access door
Ⓔ Canvas duct
Ⓖ Connect common reference potential wire between duct-work to air conditioner
[Fig. 7-1-3]
Model
PEA-RP100, 125, 140
8
[Fig. 8-1]
L
N
S1
S2
S3
Ⓑ Air outlet
Ⓓ Ceiling surface
Ⓕ Keep duct-work length 850 or more
A
B
D
G
C
A
B
C
1102 8 × 130 (=1040) 1000 7 × 130 (=910)
1
2
TB15
Indoor Power Board A
2
CND
CN3C
S1
S2
S2 S3
S1
S2
S2
TB
S3
TB4
S1
S2
S2
S3
CND
CN3C
Indoor Power Board B
7.1
[Fig. 7-1-2]
Ⓐ Inlet duct flange
Ⓒ Sensor protection plate
Ⓔ Inlet duct
34
J
E
H
I
2 × 130(=260)
25
2 × 100(=200)
F
K
250
D
E
F
G
330
105
45
8.1
1
CN22
Indoor Control Board A
Indoor Control Board B
10 mm
2-
12.5
25~100 mm
Ⓑ Return air temperature sensor
Ⓓ Sensor fixture
H
I
J
K
31
35
22
95
Ⓐ Outdoor unit power supply
Ⓑ Earth leakage breaker
Ⓒ Wiring circuit breaker or isolating switch
Ⓓ Outdoor unit
Ⓔ Indoor unit/Outdoor unit connecting wire
Ⓕ Remote controller (option)
Ⓖ Indoor unit
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pea-rp125Pea-rp140gaa

Table of Contents