Operation - Panasonic JS-950 Series User Manual

Pos workstation
Hide thumbs Also See for JS-950 Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7

2. Operation

■ AC Cord Kit Installation
1. How to install the AC Cord
(1) To confirm the I/F connector on a bottom side of Main Block, lay it as shown in figure (1).
(2) Unpack the AC Cord, and then connect it to AC Inlet as shown in figure (2).
(3) Fit the Cord Clamp to AC Cord, and fix it by attached screw as shown in figure (3)-1, 2 and 3.
(4) Reawake Main Block as shown in figure (4).
(1)
(2)
(3)-1
AC Inlet
(3)-2
(3)-3
(4)
12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents