7
OUTLINES AND DIMENSIONS
OUTDOOR UNIT
MXZ-18TV -
E1
Air in
Drainage hole {33
23
Handle
Bolt pitch for installation
500
Drainage
400
hole {33
347.5
Air in
45.4
Air out
16
800
113
REQUIRED SPACE
Even if the right / left sides or
back side are vacant, the top
has to be at least 100mm
unobstructed.
40
69
Handle
Service
port
6
WA
WA
WB
WA In case of poorly-ventilated place, the front
or the back has to be at least 200mm
unobstructed.
WB The wall may get dirty in case the air is
discharged toward it.
Liquid refrigerant pipe joint
Refrigerant pipe (flared) {6.35
Gas refrigerant pipe joint
Refrigerant pipe (flared) {9.52
165
Unit: mm