Carrier 58MCA Installation, Start-Up, And Operating Instructions Manual page 25

4-way multipoise fixed-capacity direct-vent condensing gas furnace sizes 040-140, series 170
Table of Contents

Advertisement

VENT PIPE
HORIZONTAL TO ROOF
COMBUSTION-AIR PIPE
VERTICAL TO ROOF
Table 6—Approved Combustion-Air and Vent Pipe, Fitting and Cement Materials
ASTM SPECIFICATION
MATERIAL PIPE FITTINGS SOLVENT CEMENT AND PRIMERS
(MARKED ON MATERIAL)
D1527
D1785
D2235
For ABS
D2241
D2466
D2468
D2564
For PVC
D2661
D2665
F438
F441
F442
F493
For CPVC
F628
F656
For PVC
F891
12 " MIN
COMBUSTION-AIR PIPE
12 " MIN
NOTE: A 12 In. minimum offset pipe section is recommended with
short (5 to 8 ft) vent systems. This recommendation is to reduce
excessive condensate droplets from exiting the vent pipe.
Fig. 34—Short Vent (5 to 8 Ft) System
ABS
Pipe
PVC
Pipe
PVC
Pipe
PVC
Fittings
ABS
Fittings
ABS
Pipe
Fittings
PVC
Pipe
Fittings
CPVC
Fittings
CPVC
Pipe
CPVC
Pipe
ABS
Pipe
PVC
Pipe
12 " MIN
VENT PIPE
HORIZONTAL TO SIDEWALL
COMBUSTION-AIR PIPE
VENT PIPE
VERTICAL TO SIDEWALL
Solvent
Cement
Solvent
Cement
Solvent
Cement
Cellular Core DWV at Schedule-40 IPS sizes
Primer
25
COMBUSTION-AIR PIPE
12 " MIN
VENT PIPE
DESCRIPTION
Schedule-40
Schedule-40
For ABS
SDR-21 & SDR-26
Schedule-40
Schedule-40
For PVC
DWV at Schedule-40 IPS sizes
DWV
Schedule-40
Schedule-40
SDR
For CPVC
For PVC
Cellular Core Schedule-40 & DWV
A96230

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

58mxa

Table of Contents