Motorola AP-7131N-FGR Installation Manual page 22

Access point
Hide thumbs Also See for AP-7131N-FGR:
Table of Contents

Advertisement

16
AP-7131N-FGR Access Point: Installation Guide
5. Create a light pipe path hole in the target position on the ceiling tile.
6. Use a drill to make a hole in the tile the approximate size of the access point LED light pipe.
CAUTION
7. Remove the light pipe's rubber stopper (from the access point) before installing the light
pipe.
8. Connect the light pipe to the bottom of the access point. Align the tabs and rotate
approximately 90 degrees. Do not over tighten.
9. Fit the light pipe into hole in the tile from its unfinished side.
10. Place the decal on the back of the badge and slide the badge onto the light pipe from the
finished side of the tile.
11. Attach the antennas to their correct connectors.
For information on the antennas available to the access point, see "
page 5.
CAUTION
12. Motorola recommends attaching safety wire to the access point safety wire tie point or
security cable (if used) to the access point's lock port.
Motorola recommends care be taken not to damage the finished
surface of the ceiling tile when creating the light pipe hole and
installing the light pipe.
Ensure you are placing the antennas on the correct connectors to
ensure the successful operation of the AP-7131N-FGR access point.
" on
Antenna Options

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents