DUMP HANDLE TUBE
RE TAIN ER
SPRING
1/4 X 2"
CARRIAGE
BOLTS
1/4 LOCK NUT
FRONT BAGGER TUBE
BAGGER ADJUSTMENT (See Fig. 7)
For proper bag function and appearance, it may be nec-
es sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender
and the bagger top surface should be even with the top
surface of the fender. To adjust bagger position:
HORIZONTAL ADJUSTMENT
•
Slightly loosen the nuts securing the bagger RH and
LH hor i zon tal adjustment brackets. Loosen only enough
so the brackets keep their position, but allow them to
be moved.
•
Move the brackets the amount forward or back ward you
wish the bag assembly to move. Retighten the nuts
securely.
VERTICAL ADJUSTMENT
•
Slightly loosen the nuts securing the vertical adjust-
ment brackets. Loosen only enough so the brackets
keep their position, but allow them to be moved.
•
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
•
Reinstall the bagger as sem bly and check the bagger
to fender fi t. If necessary, repeat the procedure until
proper fi t is attained.
TOP SURFACES
EVEN
HOR I ZON TAL
AD JUST MENT
BRACKET
VERTICAL
AD JUST MENT
BRACK ET
ASSEMBLY
CLEVIS
PIN
CAP
VINYL
BINDING
FIG. 6
6MM (1/4") - 9MM (3/8")
02329
FIG. 7
TO ASSEMBLE AND INSTALL MULCHER
PLUG (See Fig. 8)
•
Remove spring retainer and pin from handle.
•
Insert plug into handle. Make sure that the letter "A"
on both the plug and handle are on the same side and
that they can both be seen from the top when laying
on the ground.
•
Secure with pin and retainer spring provided. For in-
stal la tion see "To Convert Mower" in Section 5 of this
manual.
9
HAN DLE
RE TAIN ER
SPRING
PIN
PLUG
FIG. 8