10.0 COMPLETION
10.1
Completion
Case Front Panel
1. Hinge the facia panel upwards and refit the case
front panel. Tighten the securing screws (Fig. 34).
2. Instruct the user in the operation of the boiler and
system, explaining the operational sequence.
3. Carefully read and complete all sections of the
"Benchmark" Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user for
safe keeping and each subsequent regular service
visit recorded.
4. For IE, it is necessary to complete a "Declaration
of Conformity" to indicate compliance with I.S. 813.
An example of this is given in I.S. 813 "Domestic
Gas Installations". In addition it is necessary to
complete the "Benchmark" Log Book.
5. Hand over the Users Operating, Installation and
Servicing Instructions and the Log Book, giving
advice on the necessity of regular servicing.