How To Install; Unpacking The Air Conditioner; Preparing The Air Conditioner - Haier HWF05XCL User & Care Manual

Room air conditioner
Hide thumbs Also See for HWF05XCL:
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH

UNPACKING THE AIR CONDITIONER

REMOVE PACKAGING MATERIALS
• Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE:
T
h
e
e r
a
open the cabinet.
• Handle the air conditioner gently.
• Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
• The air conditioner must be standing upright for 2 hours prior to installation and operation.

PREPARING THE AIR CONDITIONER

INSTALL TOP CHANNEL
3/8" Scr
ew
(actual size)
1. Place the top channel on the top of the air conditioner, lining up
the holes in the top channel with the holes in the top of the unit.
Make sure the channel is facing forward as indicated by the
illustrations.(See Fig.7&8)
2. Using 3/8" self-tapping screws, attach the top channel to the top
of the air conditioner. (See Fig.8)
Use three (3) 3/8" self-tapping screws for model:
HWF05XCL
PAGE 10
WARNING
EXCESSIVE WEIGHT HAZARD
When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
possible sharp edges and metal fins.
e r
N
O
i
t n
r e
a n
p l
a
k c
n i
g
Top Channel
m
t a
r e
l a i
i s
s n
d i
e
h t
e
i a
c r
Front

HOW TO INSTALL

o
n
d
t i
o i
n
r e
o t
e r
m
o
e v
Fig. 7
Fig. 8
D
o
N
t o

Advertisement

Table of Contents
loading

Table of Contents