Cisco CATALYST 6500 WS-X6066-SLB-S-K9 Installation Note page 17

Catalyst 6500 series switch content switching module with ssl
Table of Contents

Advertisement

Figure 4
Note
Tighten the two captive installation screws on the module.
e.
Note
Vertical slots
Position the switching module in the slot. (See
a.
switching-module carrier with the slot guides on the top and bottom of the slot.
78-16856-01
Ejector Lever Closure in a Horizontal Slot Chassis
WS-X6K-SU P2-2GE
1
CONSOLE
PORT
MODE
CONSOLE
SUPERVIS OR2
PCMCIA
WS-X6K-SU P2-2GE
2
CONSOLE
PORT
MODE
CONSOLE
SUPERVIS OR2
PCMCIA
3
4
WS-C650 0-SFM
5
SWITCH FABRIC MDL
6
Ejector levers flush
with module faceplate
Failure to fully seat the module in the backplane connector can result in system messages.
Make sure that the ejector levers are fully closed before tightening the captive installation
screws.
Catalyst 6500 Series Switch Content Switching Module with SSL Installation Note
Switch
Load
100%
PORT 1
PORT 2
EJECT
1%
Switch
Load
100%
PORT 1
PORT 2
EJECT
1%
Figure
5.) Make sure that you align the sides of the
Installing the CSM-S
17

Advertisement

Table of Contents
loading

Table of Contents