N. Go to the Bypass Setup screen and initiate the setup sequence. Note that this process
may take up to approximately 5 minutes and you cannot abort this sequence.
Setup
Panel
Bypass
O. Go to the Programming menu and program all temperature setpoints and schedules for
each zone. Refer to section 5.2 for programming features.
P. Return to the Main Menu. System is ready to operate. Place the system mode of operation,
fan control, and schedule to the desired settings.
SlimZone Premier
Are you sure ?
3
Yes
No
You may abort the
sequence here.
Bypass setup
2
Step 06
Wait 30
25