Lennox ML193UH Installation Instructions Manual page 27

Merit series gas furnace upflow / horizontal air discharge
Table of Contents

Advertisement

7 - If intake and exhaust piping must be run up a side wall
to position above snow accumulation or other ob­
structions, piping must be supported. At least one
bracket must be used within 6" from the top of the el­
bow and then every 24" (610mm) as shown in figure
42, to prevent any movement in any direction. When
exhaust and intake piping must be run up an outside
wall, the exhaust piping must be terminated with pipe
sized per table 8.The intake piping may be equipped
with a 90° elbow turndown. Using turndown will add 5
feet (1.5m) to the equivalent length of the pipe.
8 - A multiple furnace installation may use a group of up to
four terminations assembled together horizontally, as
shown in figure 40.
EXHAUST
VENT
12" (305mm)
Minimum
Above Average
Snow
Accumulation
CLAMP
DIRECT VENT CONCENTRIC ROOFTOP TERMINATION
71M80, 69M29 or 60L46 (US)
44W92 or 44W93 (Canada)
FIGURE 38
FIELD-PROVIDED
REDUCER MAY BE REQUIRED
TO ADAPT LARGER VENT
PIPE SIZE TO TERMINATION
OUTSIDE
WALL
EXHAUST
VENT
INTAKE
CLAMP
AIR
(Not Furnished)
DIRECT VENT CONCENTRIC WALL TERMINATION
71M80, 69M29 or 60L46 (US)
44W92 or 44W93 (Canada)
FIGURE 39
1 1/2" (38mm) accelerator
provided on 71M80 & 44W92
kits for ML193UH045P24B,
070P24B & 070P36B
FLASHING
INTAKE
(Not Furnished)
AIR
SHEET METAL STRAP
(Clamp and sheet metal strap
must be field installed to support
the weight of the termination kit.)
FIELD-PROVIDED
REDUCER MAY BE REQUIRED
TO ADAPT LARGER VENT
PIPE SIZE TO TERMINATION
1-1/2" (38mm) accelerator
provided on 71M80 & 44W92
kits for ML193UH045P24B,
070P24B & 070P36B
INTAKE
AIR
EXHAUST
VENT
12" (305mm) Min.
INTAKE
AIR
above grade or
average snow
accumulation.
GRADE
EXHAUST
VENT
INTAKE
AIR
Inches (mm)
optional intake elbow
OPTIONAL VENT TERMINATION FOR MULTIPLE UNIT
INSTALLATION OF DIRECT VENT WALL TERMINATION KIT
2" EXTENSION FOR 2" PVC
PIPE1" EXTENSION FOR 3"
PVC PIPE
FURNACE
INTAKE
PIPE
FLUSH-MOUNT SIDE WALL TERMINATION KIT
51W11 (US) or 51W12 (Canada)
Page 27
12"
(305mm)
5-1/2"
5"
(140mm)
(127mm)
18" MAX.
Front View
(457mm)
EXHAUST VENT
12" (305mm) Min.
above grade or
average snow
INTAKE
accumulation.
AIR
Side View
(30G28 or 81J20)
FIGURE 40
FURNACE
EXHAUST
4''
PIPE
GLUE EXHAUST
END FLUSH INTO
TERMINATION
FLAT
1-1/2" ACCELERATOR
SIDE
(
all -45, -070 and -090 units)
FIGURE 41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merit ml193uh

Table of Contents